Infrastructure Management Agent · Use case
How can a public works team plan maintenance with an AI agent on its own infrastructure?
An infrastructure management agent reads inspection reports, sensor readings and work orders for roads, bridges and buildings, lists the assets whose records point to a growing fault, and proposes a repair schedule with the evidence for each item. Engineers decide what is repaired and when. The agent runs on infrastructure the agency controls.
Inspection reports pile up.
Repairs follow failures.
- ✗ 01Inspection reports and sensor readings sit in separate systems, so planners see a fault when it has become a failure.
- ✗ 02A repair plan must be explained to the people who fund it.
Where it stops for a person
Always, before work is scheduled.Always. The agent does not judge that a structure is safe and does not raise a work order. Engineers decide.
It proposes a schedule.
Engineers decide.
Step · 01
Asset, sensor and work-order data are connected.
Step · 02
The agent reads the latest inspection reports.
Step · 03
It lists assets whose records show a worsening condition.
Step · 04
It proposes a repair order and cites the evidence for each asset.
Step · 05
Engineers review the proposal and set the schedule.
Reads from · connectors
The agent connects to a Database for asset and sensor data, to SharePoint for inspection reports and to ServiceNow for work orders.
Acts through · MCP servers
Nothing. It proposes a schedule.
What you set up
- Connect the asset, sensor and work-order data.
- Describe how you rank condition and risk.
- Test against past inspections and the repairs that followed.
Where it runs
The agent, its knowledge store and the model run on infrastructure you own or control. You choose the model and serve it yourself, so questions, documents and answers are not sent to a public AI service.
How you get it today
This page is labelled Use case: the agent is built in Katonic Studio. You describe the job, connect what is named above, add test questions and release the agent once it passes them. When the Catalog holds a tested template for this job, this page will carry the Template label and show how to take it.
Does the agent say whether a bridge is safe?
No. It points engineers to the assets whose records need attention. Engineers assess safety.
Does it raise work orders?
No. It proposes a schedule. A person raises the work.
Can the proposal be explained?
Yes. Each item cites the inspection or reading behind it.